{"id":13,"date":"2017-07-07T20:21:07","date_gmt":"2017-07-07T20:21:07","guid":{"rendered":"http:\/\/utsaengineer.wpengine.com\/faculty-page-example\/?page_id=13"},"modified":"2017-07-07T20:21:07","modified_gmt":"2017-07-07T20:21:07","slug":"research","status":"publish","type":"page","link":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/research\/","title":{"rendered":"Research"},"content":{"rendered":"<p><strong> Research Thrusts<\/strong><\/p>\n<p>Lean Manufacturing Assessment and Implementation<br \/>\nValue Stream Analysis and Improvement<br \/>\nLean and Six Sigma Integration<br \/>\nSupply-Chain Management<br \/>\nAdvanced System Simulation<br \/>\nFactory Automation and Integration<br \/>\nModular Cell Control Systems<br \/>\nIntelligent Scheduling and Shop Floor Control<br \/>\nEnterprise Modeling and Process Re-engineering<br \/>\nModeling and Analysis of Manufacturing Systems<\/p>\n<p><strong>Research Projects<\/strong><\/p>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td><strong>&#8220;A Closed-Loop, Real-Time Resource Planning and Control for Lean Production,&#8221;<\/strong> PI: F F Chen, Center for High Performance Manufacturing, VT, 07\/01\/05-06\/30\/06.<\/td>\n<\/tr>\n<tr>\n<td><strong>&#8220;Flexible Web-based Kanban,&#8221;<\/strong> PI: F F Chen, Center for High Performance Manufacturing, VT, 07\/01\/05-06\/30\/06.<\/td>\n<\/tr>\n<tr>\n<td><strong>&#8220;Process Mapping and Cost-Time Profiling in Support of Lean Manufacturing,&#8221;<\/strong> PI: F F Chen (Co-PI- Dr. Robert Sturges &#8211; ISE), $38,736, Center for High Performance Manufacturing, VT, 07\/01\/04-06\/30\/05.<\/td>\n<\/tr>\n<tr>\n<td><strong>&#8220;Enhanced Lean Manufacturing and Six-Sigma Integration: Assessment, Project Identification and Functionality,&#8221;<\/strong> PI: F F Chen (Co-PI- Dr. Kevin Creehan &#8211; CHPM), $38,736, Center for High Performance Manufacturing, VT, 07\/01\/04-06\/30\/05.<\/td>\n<\/tr>\n<tr>\n<td><strong>&#8220;Lean Manufacturing for Productivity and Quality Improvement: A Progressive Process Improvement Approach,&#8221;<\/strong> PI: Robert Sturges &#8211; ISE, Co-PI: F F Chen $29,875 plus $20,000 CHPM matching. Bristol Compressors, 08\/25\/03-02\/26\/04 (6 months).<\/td>\n<\/tr>\n<tr>\n<td><strong>&#8220;A Decision Support and Analysis Tool for Lean Manufacturing Assessment and Implementation,&#8221;<\/strong> PI: F F Chen, $34,000, CHPM Center-Designated Project, July 1, 2003- June 30, 2004.<\/td>\n<\/tr>\n<tr>\n<td><strong>&#8220;Enhancing Virginia&#8217;s Research Infrastructure for High-Performance Manufacturing,&#8221;<\/strong> PI: F F Chen (Co-PIs: Al Loos &#8211; Eng Sc. &amp; Mechanics, Ron Kander &#8211; Materials Sc. &amp; Eng.), $4,339,577 (VA Commonwealth Technology Research Fund, Grant No: SE2002-03) plus $4,614,107 institutional matching and industry cost sharing,7\/1\/2001-6\/30\/2005 (4 years).<\/td>\n<\/tr>\n<tr>\n<td><strong>&#8220;A Knowledge and Distributed Intelligence Approach to Concurrent Product, Process, and Manufacturing System Design,&#8221;<\/strong> PI: F F Chen (with 3 other investigators), College of Engineering Collaborative Research Grant, University of Toledo, $72,552, 2 RAs, 1998-1999 (12 months).<\/td>\n<\/tr>\n<tr>\n<td><strong>&#8220;Real-Time Hardware-Based Simulation Technology for FMS Control Optimization,&#8221;<\/strong> NSF Presidential Faculty Fellow Awards, NSF\/EHR\/GERD PFF Program, $530,000. (plus $80,000 institutional cash match for research equipment) 1997-2003 (6 years), 2-4 RAs\/Semester.<\/td>\n<\/tr>\n<tr>\n<td><strong>&#8220;An University-Industry Virtual Alliance for Radical Innovation in Flat Glass Manufacturing,&#8221;<\/strong> Co-PI: F F Chen, (PI: John Dismukes, Chemical Engineering, and three other Investigators) NSF\/ENG\/ DMII MOTI Program, $299,805, 1997-1999 (2 years), 2 RAs\/year under F. Chen&#8217;s supervision.<\/td>\n<\/tr>\n<tr>\n<td><strong>&#8220;Rapid Design and Analysis of Advanced Manufacturing Systems: A Decomposition-Transformation Approach,&#8221;<\/strong> PI: F F Chen (no Co-PIs), NSF\/DMII\/Integration Engineering Program &#8211; Unsolicited and Air Force Research Labs, $212,401, 2\/1\/1997-1\/31\/2000 (36 months); 2 grad RAs &amp; 2 Undergrad\/Semester.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Research Thrusts Lean Manufacturing Assessment and Implementation Value Stream Analysis and Improvement Lean and Six Sigma Integration Supply-Chain Management Advanced System Simulation Factory Automation and Integration Modular Cell Control Systems Intelligent Scheduling and Shop Floor Control Enterprise Modeling and Process Re-engineering Modeling and Analysis of Manufacturing Systems Research Projects &#8220;A Closed-Loop, Real-Time Resource Planning and &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/ceid.utsa.edu\/pmarkopoulos\/research\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Research&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-13","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Research - Dr. Panos P. Markopoulos<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ceid.utsa.edu\/pmarkopoulos\/research\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Research - Dr. Panos P. Markopoulos\" \/>\n<meta property=\"og:description\" content=\"Research Thrusts Lean Manufacturing Assessment and Implementation Value Stream Analysis and Improvement Lean and Six Sigma Integration Supply-Chain Management Advanced System Simulation Factory Automation and Integration Modular Cell Control Systems Intelligent Scheduling and Shop Floor Control Enterprise Modeling and Process Re-engineering Modeling and Analysis of Manufacturing Systems Research Projects &#8220;A Closed-Loop, Real-Time Resource Planning and &hellip; Continue reading &quot;Research&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ceid.utsa.edu\/pmarkopoulos\/research\/\" \/>\n<meta property=\"og:site_name\" content=\"Dr. Panos P. Markopoulos\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ceid.utsa.edu\\\/pmarkopoulos\\\/research\\\/\",\"url\":\"https:\\\/\\\/ceid.utsa.edu\\\/pmarkopoulos\\\/research\\\/\",\"name\":\"Research - Dr. Panos P. Markopoulos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ceid.utsa.edu\\\/pmarkopoulos\\\/#website\"},\"datePublished\":\"2017-07-07T20:21:07+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ceid.utsa.edu\\\/pmarkopoulos\\\/research\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ceid.utsa.edu\\\/pmarkopoulos\\\/research\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ceid.utsa.edu\\\/pmarkopoulos\\\/research\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ceid.utsa.edu\\\/pmarkopoulos\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Research\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ceid.utsa.edu\\\/pmarkopoulos\\\/#website\",\"url\":\"https:\\\/\\\/ceid.utsa.edu\\\/pmarkopoulos\\\/\",\"name\":\"Dr. Panos P. Markopoulos\",\"description\":\"Associate Professor and Margie and Bill Klesse Professor, Departments of Electrical &amp; Computer Engineering and Computer Science, The University of Texas at San Antonio\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ceid.utsa.edu\\\/pmarkopoulos\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Research - Dr. Panos P. Markopoulos","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/research\/","og_locale":"en_US","og_type":"article","og_title":"Research - Dr. Panos P. Markopoulos","og_description":"Research Thrusts Lean Manufacturing Assessment and Implementation Value Stream Analysis and Improvement Lean and Six Sigma Integration Supply-Chain Management Advanced System Simulation Factory Automation and Integration Modular Cell Control Systems Intelligent Scheduling and Shop Floor Control Enterprise Modeling and Process Re-engineering Modeling and Analysis of Manufacturing Systems Research Projects &#8220;A Closed-Loop, Real-Time Resource Planning and &hellip; Continue reading \"Research\"","og_url":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/research\/","og_site_name":"Dr. Panos P. Markopoulos","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/research\/","url":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/research\/","name":"Research - Dr. Panos P. Markopoulos","isPartOf":{"@id":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/#website"},"datePublished":"2017-07-07T20:21:07+00:00","breadcrumb":{"@id":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/research\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ceid.utsa.edu\/pmarkopoulos\/research\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/research\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/"},{"@type":"ListItem","position":2,"name":"Research"}]},{"@type":"WebSite","@id":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/#website","url":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/","name":"Dr. Panos P. Markopoulos","description":"Associate Professor and Margie and Bill Klesse Professor, Departments of Electrical &amp; Computer Engineering and Computer Science, The University of Texas at San Antonio","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/wp-json\/wp\/v2\/pages\/13","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/wp-json\/wp\/v2\/comments?post=13"}],"version-history":[{"count":0,"href":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/wp-json\/wp\/v2\/pages\/13\/revisions"}],"wp:attachment":[{"href":"https:\/\/ceid.utsa.edu\/pmarkopoulos\/wp-json\/wp\/v2\/media?parent=13"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}